10kW LNG 개질기
코드명 | LNGR-C10 LT | |
생산지 | Made in EU | |
리드 타임 | 주문일로 4주 | |
제품 가격 | 별도 문의 | |
배송 정보 | 익일특송 Door to Door (DHL Express) | |
결제 방법 | 100% Upfront (세금계산서를 통한 내자거래) | |
보증 기간 | 주문일로부터 1년 | |
비고 | 본 제품은 NDA 계약이 요구됩니다. |


제품 설명
버너 에어서플라이 (Burner Air Supply)

The burner air supply unit consists of a valve block with two solenoid valves, which switch the air path from start to FLOX combustion mode. A 24-V radial blower is fixed at the block and is equipped with a control box. Air flow is controlled by a 0-10V control voltage. Control of air flow is customer’s scope of supply. The burner and blower are well adapted and optimised. Any significant pressure loss, neither on the suction side nor in the exhaust line must be avoided.
가스 서플라이 유닛 (Gas Supply Unit)

The gas supply unit consists of an integrated gas valve block with solenoid on/off valves for feed and fuel gas, as well as with a separate proportional valve for feed flow control via a digital controller. Flow rates and control of feed is customer’s scope of supply.
탈황 유닛 (Desulfurisation Unit)

· 유기물 (천연물 공급원) 및 무기 흡착제
· appr 용도로 설계. EU가스로 2000h 운전.
· 2-3ppm S 함유량에서 수명 10.000h 이상
· 공급 가스 라인과 연결.
공정 급수 유닛 (Process Water Supply Unit)

버너 컨트롤 유닛 (Burner Control unit)

The burner control unit consists of an automated burner control (industrial standard), specially designed for FLAME-FLOX burners. FLOX requires fail-safe temperature control and the subsequent switch of the air path in the burner. The fail-safe procedure can be realised in the main control of the burner. A hardware wired safety control switch switch (JUMO) is part of the delivery. A 220V ignition transformator supplies ignition energy for the heat-up procedure in burner STARTmode. Wiring and integrating the units in the main control box is customer’s scope of supply. For large production quantities and for cost reasons, it is recommended to integrate the burner control in the system control unit.
프로세스의 흐름과 인터페이스 (Process Flow and Interface)

Technical Specification C10-LT
Reforming:
Feed Input
Natural gas (S<1ppm) max. 3 Nm³/h@20mbar
Water (DI <1mS/cm, p=6 bar) 6 – 10 l/h
(Critical are Ca-based ions, not metallic based ions)
Reformate ouput max 20 Nm³/h
Hydrogen: 12 Nm³/h
CH4: <2%
CO < 10ppm @S/C=4
Temperature 200°C
Pressure 200 mbar
(for Δp BOP, stack anode,...)
Fuel consumption (NG, anode-off gas) max. 15 kW at rated load
Burner System : (integrated in Reformer)
Burner with recuperator for anode-off-gas combustion:
Power max. 15 kW
Operation range 1,1 < l <1,5
Emissions (5% O2, dry basis) CO < 50 ppm
NOx< 50 ppm
Temperature in combustion chamber 850 -950 °C
Exhaust gas temperature @ rated load < 150°C
Air pressure appr. 70 mbar
Anode-off Gas pressure appr. 40 mbar
Start Burner:
Power @ 20mbar NG pressure appr. 10 kW
Air fuel ratio 1,2
Air pressure < 40 mbar
Gas pressure 18 mbar
Additional fuel 18 mbar
Geometric Data:
Overall Size cylindrical shape (dxh) 450 x 1200mm
(height with media supply connectors)
Volume 190 l
Weight 140 kg
Miscellaneous:
Efficiency (based on LHV) 82%
Electric power demand auxiliaries 140W
Max. external surface temperature < 30K above ambient
Turn-down ratio 1:3
Cold start from 20°C (cold iron) appr. 70 min **
Start from stand-by (T_Shift=200°C, T_Reactor 550°C) appr. 10 min **